The buliding – or more accurately, demolition – work has begun. Jean, Sophie and Lauren are safely back in Ireland while this is going on but I am faced with a cold shower in the morning. The top-floor bathroom has been stripped and will be divided into a small shower room and a study (with three girls in the house I am going to need a retreat however small!). The builder ceiling has also been stripped and will be vaulted directly upwards to a large velux window.
The rest of the house is being completely rewired – all sockets and switches being replaced, ethernet cable being installed, and new sat/tv sockets being wired.
The cellar has also been emptied and some of the internal walls taken out – I’ll put some more pics up in the next few days.
One thought on “House Redevelopment Begins”
I’m no expert, but I thinkThat Attic could do with a bit of insulation